Home> Blog> Stop Wasting Time: Cold Heading for Steel Balls

Stop Wasting Time: Cold Heading for Steel Balls

November 04, 2026

Cold Heading is a fast and efficient method for producing Steel Balls in high volumes. By forming the material under pressure rather than removing excess stock, it achieves precise dimensions, smooth surface quality, and consistent performance while minimizing material waste and lowering production costs. Compared with slower manufacturing methods, cold heading helps businesses improve productivity, shorten lead times, and maintain reliable quality—making it a smart choice for demanding steel ball applications.



Stop Wasting Time: Boost Steel Ball Production with Cold Heading



When I look at steel ball production, I often see the same problem: too much time is spent on cutting, heating, handling, and correcting dimensional errors. These delays raise labor costs and make production planning harder.

Cold heading offers a practical way to improve the forming stage for many steel ball applications. The process uses pressure to shape wire or cut blanks at room temperature. It can produce a near-spherical form before flashing, heat treatment, grinding, and inspection.

The method is not suitable for every ball size or steel grade. The result depends on material condition, tooling design, machine capacity, and the finishing process. A clear production plan helps prevent wasted trials.

Where Cold Heading Fits in Steel Ball Production

A typical cold headed steel ball process may include:

  1. Wire preparation
  2. Cutting or blanking
  3. Cold heading
  4. Flash removal
  5. Heat treatment
  6. Grinding
  7. Polishing or lapping
  8. Final inspection

During cold heading, the machine applies controlled force to form the blank inside a die. The process can create a shape that is close to the final ball profile. This reduces the amount of material removed during later grinding.

For bearing balls, automotive parts, valves, bicycles, pumps, and general industrial equipment, this can help create a stable production flow. The exact process depends on the required diameter, hardness, roundness, surface finish, and load conditions.

Why Production Time Can Be Reduced

The main time savings come from reducing repeated handling and heavy material removal.

A machining process may begin with a larger piece of steel and remove material until the ball reaches the target size. Cold heading uses a measured blank and forms it through dies. Less cutting is needed, and the machine can process multiple parts in a repeated cycle.

I see three areas where manufacturers often gain better control:

  • Shorter forming cycles: Automated heading machines can produce parts at a steady rate.
  • Lower material waste: The blank size is planned before forming.
  • More consistent part flow: Each blank follows the same forming path.

The actual output depends on the machine and part design. A small steel ball may be formed at a higher rate than a large ball that requires greater forming force. Tool changes, inspection stops, and material supply also affect total production time.

Step 1: Check the Steel Grade

Material selection should be completed before die design begins.

Common options include carbon steel, alloy steel, stainless steel, and bearing steel. Each material behaves differently under pressure. Some grades may need spheroidized annealing or another softening treatment before heading. This lowers forming resistance and reduces the risk of cracks.

I recommend checking these points:

  • Chemical composition
  • Wire diameter tolerance
  • Hardness before forming
  • Surface defects
  • Lubrication condition
  • Required hardness after heat treatment

A steel wire with scratches, scale, or uneven hardness can create trouble during forming. The defect may not appear until grinding or final inspection, when the cost of correction is higher.

Step 2: Design the Blank Correctly

The blank is the starting point for the steel ball. Its length and diameter affect the final shape, flash size, and material use.

A blank that is too small may create an incomplete ball. A blank that is too large may produce excessive flash and place more stress on the tooling. The blanking system should keep cut length within a controlled range.

For this reason, I prefer to confirm the blank volume with production data rather than rely on a simple estimate. Trial runs can show how the steel fills the die and where the flash forms.

Step 3: Prepare the Heading Dies

Die design has a direct effect on production stability.

The die must withstand repeated impact and pressure. Its working surface needs suitable hardness, toughness, and surface quality. Poor alignment can create uneven flash, out-of-round parts, or early die wear.

The die design should consider:

  • Ball diameter
  • Steel grade
  • Forming force
  • Machine stroke
  • Flash allowance
  • Expected production volume
  • Heat treatment changes

Tool life is also linked to lubrication and material cleanliness. A good die can still wear quickly when the wire surface carries scale or when the lubricant film breaks down.

Step 4: Control Lubrication and Machine Settings

Cold heading depends on controlled contact between the steel, die, and punch.

Lubrication helps reduce friction and heat. It also supports smoother material flow. The correct lubricant system depends on the steel grade, forming pressure, machine speed, and cleaning process.

Machine settings should be checked during production, not only during setup. Useful data may include:

  • Forming pressure
  • Stroke position
  • Cycle rate
  • Die temperature
  • Part weight
  • Flash size
  • Machine vibration

When these values shift, the operator can investigate the cause before a large batch is affected.

Step 5: Plan Flash Removal

Cold headed steel balls usually need flash removal after forming. The flash is the thin ring of excess material around the ball.

A trimming or flashing operation can remove this material. The method should match the ball size and the required surface condition. Poor flash removal may leave a ring, dent the surface, or increase grinding time.

I treat flash control as part of the forming process rather than a separate correction. A smaller, more even flash can reduce the load on later grinding equipment.

Step 6: Use Heat Treatment Based on the Application

Cold heading shapes the ball, but heat treatment gives the steel its working properties.

The required process may include hardening, tempering, carburizing, or another controlled treatment. The selection depends on the intended use. A bearing ball needs different performance targets from a decorative steel ball or a low-load mechanical component.

The production team should monitor:

  • Hardness
  • Core and surface structure
  • Distortion
  • Cracks
  • Batch traceability
  • Cooling conditions

Heat treatment can change dimensions. Grinding allowance should account for this change.

Step 7: Finish the Ball Through Grinding and Inspection

Cold heading can reduce machining work, but it does not remove the need for finishing.

Grinding improves roundness, diameter accuracy, and surface quality. Lapping or polishing may be used when a smoother surface is required. The correct finishing route depends on the application and tolerance.

Inspection may include:

  • Diameter measurement
  • Roundness testing
  • Surface roughness testing
  • Hardness testing
  • Crack detection
  • Visual inspection
  • Weight or density checks

A practical example is a plant making steel balls for a small pump assembly. The plant may use cold heading to create the rough spherical shape, remove the flash, heat-treat the parts, then grind them to the required diameter. If the pump only needs a general mechanical ball, the finishing allowance may be different from that used for a precision bearing ball.

When Cold Heading May Not Be the Right Choice

Cold heading works best when the part design, material, and production volume support repeated die forming.

Other methods may be more suitable when:

  • The ball diameter is very large
  • The material is difficult to form
  • The production quantity is small
  • The shape is not close to a sphere
  • The required tolerance cannot be reached through the planned finishing route
  • Tooling costs are not suitable for the project

I do not recommend selecting cold heading based on speed alone. The complete cost should include wire preparation, tooling, lubrication, flash removal, heat treatment, grinding, inspection, and maintenance.

A Practical Production Review

Before moving to mass production, I suggest reviewing the process through a small trial:

  1. Confirm the steel grade and wire condition.
  2. Produce a controlled batch of blanks.
  3. Check forming force and flash shape.
  4. Measure the parts after flash removal.
  5. Run heat treatment and record dimensional change.
  6. Grind a sample to the target size.
  7. Test roundness, hardness, surface condition, and cracks.
  8. Compare cycle time and material use with the current method.

This review gives the production team useful data before a large tooling investment is made.

Cold heading can reduce forming time and material loss in steel ball production when the process is designed around the material, machine, tooling, and finishing requirements. The best result does not come from one machine setting. It comes from matching every stage, from wire preparation to final inspection, with the ball’s actual use.


Stronger Steel Balls, Faster Results with Cold Heading



When I need steel balls for bearings, valves, pumps, or other moving parts, I look at more than material grade. The forming process also affects surface condition, dimensional control, production speed, and material use.

Cold heading can be a practical choice when the part design fits the process. It forms steel wire or cut blanks under high pressure at room temperature, helping manufacturers produce large quantities with consistent results.

The key is to match the process with the product requirements.

Why cold heading can improve steel ball production

Cold heading shapes the blank through controlled force instead of cutting the full ball from a larger piece of steel. This approach can reduce chip waste and support a stable production cycle.

The material also receives work hardening during forming. That may improve strength in the outer area of the part, depending on the steel grade, reduction ratio, and later heat treatment.

For a buyer, the main points are practical:

  • More stable production output
  • Better material utilization
  • Consistent blank size
  • Less machining before finishing
  • A clear path from forming to heat treatment and grinding

Cold heading does not remove the need for grinding, polishing, inspection, or heat treatment. Steel balls used in precision applications still need the right finishing steps.

The process I would review before placing an order

I start with the drawing and application.

A ball for a general check valve may have different requirements from a ball used in a bearing, linear motion system, or precision measuring device. Diameter tolerance, roundness, surface roughness, hardness, load, and working temperature all affect the production plan.

A typical cold heading route may include:

  1. Wire or bar selection
    The supplier chooses a steel grade that matches the required hardness, strength, corrosion resistance, and finishing method.

  2. Material preparation
    The wire is cleaned, straightened, and cut into controlled blanks. Surface defects at this stage can affect the final ball.

  3. Cold heading
    A forming machine presses the blank inside a die. The blank takes a rounded shape through one or more forming operations.

  4. Heat treatment
    The parts may be hardened and tempered to reach the required mechanical properties. The treatment must be controlled to limit distortion.

  5. Flash removal and grinding
    The forming line may leave a small seam or excess material. Grinding removes this area and improves roundness.

  6. Lapping and polishing
    Precision applications often need additional surface finishing. The required level depends on the ball grade and operating conditions.

  7. Inspection and packing
    The supplier checks size, roundness, hardness, surface quality, and batch records before shipment.

This sequence gives me a better view of the complete cost. A low forming price may not represent the full product price if the ball needs extra grinding, sorting, or rework.

Where the speed benefit comes from

Cold heading can support faster production because the machine forms parts through repeated operations rather than removing most of the material by machining.

For example, a valve component line may need thousands of steel balls with the same nominal diameter. A cold heading machine can create the basic shape at a steady cycle rate. Grinding and inspection then handle the precision work.

The actual output depends on:

  • Ball diameter
  • Steel grade
  • Blank size
  • Die design
  • Number of forming stations
  • Required tolerance
  • Machine condition
  • Heat treatment capacity
  • Grinding and sorting speed

A supplier should provide a production estimate based on the complete route, not only the forming machine cycle.

What helps create stronger steel balls

Strength comes from several factors working together.

The steel grade sets the base properties. Cold deformation can increase hardness in some areas, while heat treatment sets the final hardness and toughness range. Grinding quality affects the surface, and surface quality matters when the ball contacts a raceway, seal, seat, or other moving part.

I also pay close attention to defect control. Cracks, laps, pits, decarburization, and poor heat treatment can reduce service performance even when the diameter looks correct.

A suitable quality plan may include:

  • Raw material inspection
  • Hardness testing
  • Diameter measurement
  • Roundness measurement
  • Surface roughness checks
  • Visual inspection under controlled light
  • Magnetic particle testing for selected steel grades
  • Batch traceability

The inspection method should match the application. A general industrial ball may not need the same inspection level as a bearing ball.

A practical example

Imagine a pump manufacturer that needs carbon steel balls for a check valve. The original process uses small machined blanks. Material waste is high, and production time increases when demand rises.

The supplier reviews the diameter, hardness range, seat contact, and expected load. Cold heading is suitable for the basic shape. The parts are then heat-treated, ground, and inspected for roundness and surface defects.

The manufacturer does not judge the change by forming speed alone. It compares total material use, machining time, grinding capacity, rejection rate, and valve performance. This gives a more useful view of whether cold heading fits the product.

Questions I ask a supplier

Before requesting a quotation, I prepare clear information:

  • Ball diameter and tolerance
  • Steel grade or required material properties
  • Hardness range
  • Surface roughness requirement
  • Roundness requirement
  • Annual or monthly volume
  • Application and working environment
  • Heat treatment needs
  • Inspection documents
  • Packing and labeling requirements

I also ask for a sample approval plan. A sample can show whether the forming route creates defects, whether grinding reaches the required size, and whether the finished ball works correctly in the assembly.

Cold heading can help produce steel balls with steady output, controlled material use, and a practical path to strength and precision. The best result comes from reviewing the full process, not choosing a forming method by speed alone. When the material, die design, heat treatment, grinding, and inspection plan work together, manufacturers can build a more stable supply for steel ball applications.


Cut Costs and Improve Quality with Cold-Heading Technology



Many manufacturers face the same pressure: material prices rise, machining time adds up, and quality issues create extra inspection or rework. I see this often in the production of bolts, screws, pins, rivets, and other small metal parts.

Cold-heading technology can help reduce these costs by forming metal wire at room temperature instead of cutting the final shape from a larger bar. The process uses controlled force and precision dies to move material into the required form.

The result depends on part design, material selection, tooling, and machine setup. Cold heading is not suitable for every product, yet it can be a practical choice when the part has a repeatable shape and a steady production volume.

How cold heading reduces material waste

Traditional machining removes material to create a part. A large section of the bar may become chips, even when the finished product is small.

Cold heading works differently. The machine cuts a measured length of wire and presses it into shape. More of the original material stays in the part.

For example, a machined steel pin may start from a bar that is much larger than the finished diameter. A cold-headed pin can begin with a wire size closer to the required part size. This can lower scrap and reduce the amount of metal purchased for each batch.

The actual saving depends on the part shape and process design. A supplier should compare:

  • Raw material weight per part
  • Scrap weight
  • Cutting time
  • Number of machining operations
  • Tooling and setup cost
  • Surface finishing needs

A lower material cost is useful, but it should be measured together with tooling and production costs.

How the process can improve consistency

Cold heading uses dies and punches to shape each part through repeatable movements. Once the machine is properly set, the process can produce a stable flow of parts with consistent dimensions.

This may help reduce variation in:

  • Head diameter
  • Shank length
  • Thread blank size
  • Pin diameter
  • Shoulder position
  • Part weight

Quality still depends on wire condition, die wear, lubrication, machine accuracy, and inspection. Cold heading does not remove the need for quality control. It changes where the control work happens.

I recommend checking the first pieces after setup, monitoring key dimensions during production, and reviewing the tools when measurements begin to move. This approach can help identify wear before it creates a large quantity of nonconforming parts.

A practical production example

A fastener manufacturer was producing a small steel screw with a formed head and a threaded shank. The original process used cut blanks, heading, turning, and additional cleanup.

The production team reviewed the part drawing and changed the blank design. A cold-heading machine formed the head and reduced the amount of turning needed before thread rolling.

The change did not remove every operation. The factory still used thread rolling and inspection. The main improvement came from reducing machining time and using wire closer to the final part volume.

After process validation, the team tracked:

  • Material use per 1,000 pieces
  • Machine minutes per batch
  • Scrap quantity
  • Tool replacement frequency
  • Dimensional inspection results
  • Total cost per accepted part

This type of comparison gives a more useful picture than looking at machine speed alone.

Steps I use when reviewing a cold-heading project

  1. Check the part geometry

Cold heading works well with many round and symmetrical parts. Features such as deep holes, sharp changes in diameter, thin walls, and complex angles may need multiple forming steps or another process.

The drawing should be reviewed before selecting the machine. A small change in head shape or blank length can affect material flow and tool life.

  1. Select a suitable material

Low-carbon steel, stainless steel, aluminum, copper, and some alloy materials can be used in cold forming, depending on their condition and the part design.

The wire must have suitable strength, ductility, surface quality, and dimensional control. Material that is too hard may increase cracking or tool load. Material that is not consistent may create variation between batches.

  1. Study the forming sequence

The part may need one hit or several forming stages. Each stage should move the material without placing too much stress on the wire or the tooling.

A supplier may use process simulation, sample runs, or trial tooling to confirm whether the design can be formed reliably.

  1. Review tooling cost

Dies and punches are key parts of the process. Their price should be considered with the expected production volume and tool life.

For a small batch, machining may be more suitable because the tooling cost is spread over fewer parts. For a repeated production program, cold heading may offer better cost control after the process is stable.

  1. Run a sample batch

A sample batch can reveal issues that are not visible on a drawing. I look at cracks, folds, head fill, surface marks, dimensional drift, and ease of downstream operations.

The sample should also be tested under the same conditions used in regular production. A part that passes a short trial may still need adjustment during a longer run.

  1. Compare total cost

The right comparison includes more than the purchase price of the machine or tooling.

Review the full cost:

  • Wire or bar material
  • Scrap and recovery value
  • Tooling
  • Labor
  • Electricity
  • Machining time
  • Finishing
  • Inspection
  • Rework
  • Packaging
  • Maintenance

This calculation helps prevent a low unit price from hiding higher costs elsewhere.

How to protect quality during production

Cold-heading parts should have clear inspection points. Useful checks may include visual inspection, dimensional measurement, hardness testing, thread gauges, tensile testing, and surface checks.

The inspection plan should match the part’s function. A decorative cover and a load-bearing bolt do not need the same quality checks.

Tool maintenance also affects product quality. Worn punches may change the head shape. Damaged dies can leave marks or affect dimensions. Lubrication problems may increase friction and heat during forming.

I prefer to set a maintenance schedule based on production count, inspection data, and tool condition. Replacing a tool only after a large number of rejected parts can create avoidable cost.

When cold heading may not be the right choice

Cold heading may require careful review when:

  • The order quantity is small
  • The part design changes often
  • The material has limited ductility
  • The shape has many non-round features
  • The tooling cost is too high for the program
  • The part needs large material removal after forming
  • The production line cannot support stable inspection

Machining, warm forming, hot forging, or a combined process may fit better in these cases.

The goal is not to use cold heading for every metal part. The goal is to match the process with the product, volume, material, and quality needs.

When I evaluate a cold-heading project, I focus on the complete production path. A well-planned process can reduce material waste, shorten machining time, and support more consistent parts. The strongest result comes from testing the design, measuring the full cost, and controlling the process after production begins.


Make Better Steel Balls in Less Time


Many steel ball manufacturers face the same problem: production takes too long, yet quality still varies from batch to batch. Small changes in raw material, forming pressure, heat treatment, or grinding can affect roundness, hardness, surface finish, and service life.

I have found that faster production does not come from simply increasing machine speed. It comes from removing avoidable waiting, stabilizing each process, and checking quality at the right points.

A practical production plan can help teams make better steel balls with less wasted time.

Start with stable raw material

Steel ball quality begins with the steel wire, bar, or bearing-grade material used for production. If the material has uneven hardness or an inconsistent chemical composition, later processes may need extra correction.

I usually check:

  • Material grade and heat number
  • Diameter tolerance
  • Surface defects
  • Chemical composition
  • Internal cracks or segregation
  • Material hardness before forming

Clear incoming inspection prevents unsuitable material from entering the line. It also reduces the chance of discovering a problem after heat treatment, when correction costs more time.

A simple material record can connect each batch with its forming, heat treatment, grinding, and inspection results. This makes it easier to identify the source of a quality issue.

Reduce delays during forming

Cold heading, hot forging, and rolling each require stable machine settings. Operators should record the settings that affect ball size and shape, such as forming pressure, feed length, die condition, and production speed.

I recommend preparing a setup sheet for each steel ball size. The sheet can include:

  • Raw material diameter
  • Target ball diameter
  • Machine setting range
  • Tool replacement point
  • Sample inspection frequency
  • Common defects and possible causes

This reduces repeated trial work when the team changes from one size to another.

Tool wear also affects production time. A worn die or roller may create oversize balls, dents, or uneven surfaces. The machine may continue running, but the inspection and rework load will grow. Replacing a tool based on measured wear is more useful than waiting for a large defect batch.

Use heat treatment to control quality, not repair it

Heat treatment affects hardness, toughness, wear resistance, and dimensional stability. It should not be treated as a hidden repair step for problems created earlier.

The furnace team should control:

  • Heating temperature
  • Holding time
  • Cooling method
  • Furnace loading pattern
  • Atmosphere condition
  • Hardness after treatment

Loading too many parts into one area can create uneven heating. Placing balls too close together may also affect cooling. A stable loading method gives the furnace a better chance to produce consistent results.

I prefer checking a small sample after each heat treatment batch. If the hardness range moves outside the agreed specification, the team can pause and investigate before more material enters grinding.

This sample-based approach may add a short inspection step, but it can prevent long rework cycles.

Make grinding more predictable

Grinding often becomes the slowest stage when earlier processes produce large size variation. The machine then removes more material from some balls than others.

A better approach is to control the variation before grinding and use a clear grinding plan. The plan may include:

  • Rough grinding allowance
  • Fine grinding allowance
  • Wheel or stone condition
  • Coolant flow and temperature
  • Dressing frequency
  • Target size range at each stage

Coolant control deserves attention. Poor flow can increase heat, affect surface finish, and change the working condition of the grinding wheel. Regular checks help keep the process steady.

I also advise separating rough grinding from fine grinding. Each stage has a different purpose. Using one step to handle every correction can increase cycle time and reduce surface consistency.

Inspect during production

Final inspection alone may show that a batch has a problem, but it may not show when the problem began. In-process checks give operators useful information while production is still running.

Common checks include:

  • Diameter
  • Roundness
  • Surface roughness
  • Hardness
  • Cracks
  • Visual defects
  • Magnetic particle test results, when required

A basic inspection schedule could check the first pieces after setup, samples during production, and pieces after heat treatment and grinding. The exact frequency should match the product size, material, customer specification, and process stability.

Data should be recorded in a simple format. If the team sees diameter slowly moving toward the upper limit, it can adjust the process before the product reaches an out-of-specification condition.

Remove waiting between processes

A large part of production time can be lost outside the machines. Steel balls may wait for furnace space, inspection approval, material transfer, or tool changes.

I suggest mapping the full path from raw material to packed product. Mark the time spent on:

  • Machine operation
  • Material movement
  • Inspection
  • Waiting
  • Setup
  • Rework

A typical plant may discover that grinding is not the main delay. The real issue may be a two-hour wait for inspection results or a long changeover between different ball sizes.

Standardized carts, clear batch labels, prepared tools, and planned inspection times can reduce these gaps without changing the main equipment.

Use a small trial before changing the full line

When a team wants to raise production speed, I prefer a controlled trial. Change one process factor at a time and compare the result with the current record.

For example, a plant may test a small change in forming speed while monitoring ball diameter, surface condition, tool temperature, and later grinding time. If the faster setting creates more defects or increases grinding work, the apparent time saving is not useful.

A mid-sized production line may find that a modest speed adjustment, better tool preparation, and shorter material waiting time provide a more stable result than a large speed increase. The goal is not to make every machine run faster. The goal is to shorten the full production cycle while keeping the product within specification.

Better steel balls and shorter production time can work together when the process is measured as one complete system. Stable material, controlled forming, balanced heat treatment, predictable grinding, and timely inspection give the team a clearer path.

I have seen production teams focus on machine speed while overlooking setup time, rework, and waiting. Once those hidden delays are recorded, the practical improvement plan becomes easier to build.

We has extensive experience in Industry Field. Contact us for professional advice:anqingjichuang: info@aqballgrinder.com/WhatsApp 18055626858.


References


References

ASM International, 2010, ASM Handbook Volume 14A: Metalworking—Bulk Forming

Wang, Z G, 2012, Cold Heading and Cold Forging Technology

Altan, T, Ngaile, G and Shen, G, 2005, Cold and Hot Forging: Fundamentals and Applications

American Society for Metals, 1990, Atlas of Stress-Strain Curves

International Organization for Standardization, 2018, ISO 3290-1: Rolling Bearings—Balls—Part 1: Steel Balls

American Bearing Manufacturers Association, 2014, Steel Balls for Bearings: Quality and Performance Requirements

Contact Us

Author:

Mr. anqingjichuang

Phone/WhatsApp:

18055626858

Popular Products
You may also like
Related Information
Struggling with Roundness? Try Our Precision Solution!

Struggling with roundness and inconsistent results? Our precision solution is designed to deliver accurate, repeatable performance every time. By improving dimensional control and reducing variatio

The Truth About Surface Roughness in Grinding Machines

Surface roughness in grinding machines is not determined by a single setting. Wheel type, abrasive grain size, cutting speed, feed rate, machine rigidity, coolant performance, and workpiece materia

Save 40% Energy with Our High-Speed Steel Ball Equipment

Boost production efficiency while cutting operating costs with our high-speed steel ball equipment. Engineered for reliable, consistent performance, it optimizes energy use and can reduce consumpti

Achieve Mirror Finish with Our Ball Lapping Machine?

Achieve a flawless mirror finish with our high-precision ball lapping machine, engineered for accuracy, consistency, and efficient production. Its advanced lapping technology delivers smooth, unifo

Related Categories

Email to this supplier

Subject:
Email:
Message:

Your message must be between 20-8000 characters

Contact Us

Author:

Mr. anqingjichuang

Phone/WhatsApp:

18055626858

Popular Products
Copyright © 2026 ANQING MACHINE TOOL CO.,LTD All rights reserved. Privacy Policy
We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send